Sequoia Lodges Get Started
BPDA & Article 53 · Boston MA

Filing-ready ADU plans in two weeks. Not two months.

Custom ADU design in Boston typically takes months before you can file. Our plans are pre-designed for BPDA and Article 53 compliance — pick one, we tailor it to your lot, and you file.

Plans and engineering only — we don't build. Your contractor works from our permit-ready set.

Day 1

Pick a plan

Studio, one-bedroom, or two-bedroom — no blank-page design phase, no waiting for concepts.

Week 1

We tailor it to your lot

Site-specific adjustments handled by our principal engineer, coordinated with licensed MA architects and engineers.

Week 2

You file for permit

A complete, filing-ready set with compliance documentation — no further redesign needed.

Permit-Ready, Defined

"Permit-ready" is a specific promise.

Plenty of plan sets online are concept drawings. A permit-ready set is the complete package Boston's plan reviewers expect to see — here's what that includes.

01

Designed to BPDA & Article 53 requirements

Dimensional limits, setbacks, and use standards for Boston ADUs are built into the design — not patched in after review comments.

02

Complete, dimensioned drawing set

Floor plans, all four elevations, and building sections — drawn to scale, ready for reviewer and contractor alike.

03

Engineering, coordinated

Structural design included with 1-bedroom plans and up, with foundation, framing, and detail sheets. Every set is coordinated with licensed Massachusetts professionals.

04

Compliance notes for smooth review

Documentation mapping the design to Boston's ADU requirements, so the reviewer isn't left guessing.

05

Tailored to your lot before you file

Site-specific adjustments by our principal engineer are part of every engagement — the set you file matches your property.

FAQ

Common questions.

Do you handle the permit filing itself?

We produce the complete, filing-ready plan set and compliance documentation. You (or your contractor) submit it to the city — and because the set is built to Boston's requirements, review typically goes smoothly.

What can slow down the two-week timeline?

The most common factor is survey availability — if your property doesn't have a recent plot plan or survey, that can add time. Unusual site conditions can too. We flag anything like this up front.

Does this work outside Boston proper?

Yes. We serve Cambridge, Newton, Brookline, and surrounding Greater Boston communities. Requirements vary by municipality; the site-specific tailoring accounts for your local rules.

Do you build the ADU too?

No — we're a design and engineering firm, not a construction company. You receive a complete, permit-ready plan set and your contractor builds from it. That separation keeps our pricing fixed and our recommendations honest.

How much does a plan set cost?

$3,500 for a studio, $4,000 for a 1-bedroom (with structural engineering), and $4,500 for the 2-bedroom set with full structural engineering — our most requested package.

Get Started

Find out if your lot is permit-ready.

Tell us about your property and we'll tell you what filing would take — plan recommendation, pricing, and timeline, usually within one business day.

sequoialodges@gmail.com
Serving Boston & Greater Boston, MA